Hilton Hotel Group

Date: October 25, 2013

The scope of works included constructing a new sub-station and carrying out excavations to enable a new HV supply to be installed to the Hotel to replace existing supply from other DNO provider.

The works involved;

  • full excavation within the car park whilst maintaining traffic flow
  • excavations to break out the existing car parking bays to allow for full construction of two concrete sub-station bases
  • excavations to located existing HV cables
  • staged excavations across the car park to an existing inspection pit
  • core drilling into the pit to allow for cable jointing.
  • Installation of cables and full reinstatements.